Transparent. Organized. Stress-Free.

How We Work With You

Five Simple Steps. Complete Clarity.

Appointment

We meet to review your project scope and understand your vision.

Proposal

We create a detailed proposal for your review and approval.

Guidelines

We provide guidelines for working with our vendors or yours.

Schedule

We generate a timeline ensuring all materials arrive when needed.

Construction

We begin building — keeping you updated at every milestone.

The Construction Phase

13 Steps. Zero Guesswork.

Every reconstruction and remodeling project follows a proven sequence. Here’s what happens behind the scenes to bring your vision to life.

STEP 1

Neon green number one on black background.

Drawings

This step involves creating detailed architectural and engineering drawings of the building to be constructed.

STEP 2

2

Permits

This step involves obtaining the necessary permits from the local authorities to begin construction.

STEP 3

3

Demolition

This step involves the demolition of any existing structures on the site.

 

STEP 4

ReconstructKC

Framing

This step involves the construction of the building’s frame, including the walls, roof, and floors.

STEP 5

5

Rough in Plumbing, HVAC & Electrical

This step involves the installation of the building’s plumbing, heating, ventilation, air conditioning, and electrical systems.

 

STEP 6

6

Insulation

This step involves the installation of insulation to regulate the building’s temperature.

STEP 7

Green outlined number seven on white background.

Sheet Rocking, Tape
& Mud

This step involves the installation of drywall and the application of tape and mud to create a smooth surface.

STEP 8

Green number eight on transparent background

Flooring & Trim Work

This step involves the installation of the building’s flooring, such as carpet, tile, or hardwood, in addition to the installation of trim work, such as baseboards and crown molding.

 

STEP 9

9

Millwork Install

This step involves the installation of custom woodwork, such as cabinets, trim, and molding.

STEP 10

10

Tile

This step involves installing tile in areas such as bathrooms and kitchens.

 

STEP 11

Green number eleven on transparent background

Painting

This step involves the painting of the building’s interior.

 

STEP 12

12

Finish Plumbing / Electrical / HVAC

This step involves the installation of fixtures such as sinks, toilets, light fixtures, and thermostats.

STEP 13

13

Punchlist

This final walkthrough identifies any remaining touch-ups, adjustments, or minor corrections needed to ensure every detail meets our quality standards before project completion.

 

Get a Free Estimate

ReconstructKC is turning home improvement and remodeling dreams into reality. We provide creative design, quality craftsmanship, and a breadth of knowledge to complete your residential or commercial project on time and within an affordable budget.

Ready to get started?

Contact ReconstructKC today for a free consultation. Let’s discuss how we can help rebuild, restore, or transform your space.

Special Financing Available — Get Approved in Minutes. Apply Now →